Insa · facility 4685
14-day window 2026-06-08 → 2026-06-22

Insa — 14-day cultivation audit

Genuine 14-day substrate + climate telemetry stitched from the AROYA public API at native (~9-min) cadence. Irrigation framed in the 4-phase day (P0/P1/P2/P3); dryback reported as absolute percentage points (peak VWC − pre-irrigation trough).

Active rooms
4
Avg VWC peak
61.0%
Avg absolute dryback
16.5 pp
Avg pore-EC
5.3 mS
Avg lights-on VPD
1.4 kPa

Bloom 1.3 #19823

No active harvest group in AROYA · phase not flagged · Flower window · coverage 100.0%
VWC peak (14d)
54.6%
VWC trough (14d)
35.7%
Absolute dryback
18.9 pp
peak − trough
Substrate pore-EC
5.8 mS
trend +3.42 mS
Lights-on VPD
1.4 kPa
Air temp
76.7°F
CO₂
1027.9 ppm
Phase not flagged in AROYA (no active HG metadata) — read as balanced steering. Over the window the substrate runs an absolute P3 dry-down from a daily VWC peak of 54.6% to a pre-irrigation trough of 35.7% — an absolute dryback of ~18.9 pp (phase target 20–30% absolute pp (generative target)). Substrate pore-EC averages 5.8 mS and is stacking (+3.42 mS first→last 3d). Lights-on VPD (upper-half proxy) 1.4 kPa, air temp 76.7°F, CO₂ 1027.9 ppm. Framing: P0 activation → P1 ramp-to-runoff → P2 maintenance → P3 dry-down; dryback reported as absolute pp.

Substrate VWC — daily peak, trough & absolute-pp dryback (P3 lever)

Substrate pore-EC (steering output, mS)

Lights-on VPD (kPa) & air temp (°F)

CO₂ (ppm)