5-room cultivation audit · POWRHOUSE (facility 3754) · 2026-05-27 → 2026-06-10 — REAL 14-day trace, raw ~9-min cadence stitched into 2-day chunks via aroya-sdk v0.2.0, all five rooms ≥0.999 coverage with the pull-time coverage gate passing natively. This is a tracking audit — POWRHOUSE has prior commitments from the 2026-06 long-term review (POWR 3 was 34.1% of facility yield), so the read below grades against those promises, not as a cold start. The short version: (1) POWR 4 is the bright spot — the CO₂ crash flagged last time (1431→603 ppm) is resolved, holding steady ~1487 ppm, and it is the only room actively stacking EC (+1.91 mS, 4.1→5.9 over the window) — textbook generative bulking. Its VPD is still soft (0.78 kPa) so that recommendation only partly landed. (2) POWR 3's drain-EC problem is unresolved — zone 57895 still reads 11.7→14.0 mS drain EC (peak 14.9), the 24 h leach we asked for has not been run. Substrate EC averages 7.01 mS at the top of the band; this is the highest-priority open item. (3) POWR 1 holds its bulking pattern but VPD stays soft (0.89 kPa vs 1.2–1.4) and the substrate-temp inversion persists (substrate 77.5°F ≥ air 77.5°F) — both prior YELLOW items are unchanged. (4) POWR 2 is mid-flush for turnover — substrate EC pulled back to 3.51 mS (net -0.32), tracking the ripening taper plan. (5) Veg Room runs an 18/6 day with a shallow 3.8 pp dryback and low 4.02 mS EC — appropriate for veg. Data window: 2026-05-27 → 2026-06-10; coverage 0.9991–0.9996 per room (Data Quality). Shot counts are derived from VWC step-up signatures (≥2 pp jumps in 1-h bins) — see the footnote. Dryback is in absolute pp (peak VWC − pre-irrigation low) throughout, per AROYA convention.5-room cultivation audit · POWRHOUSE (facility 3754) · 2026-05-27 → 2026-06-10 — REAL 14-day trace, raw ~9-min cadence stitched into 2-day chunks via aroya-sdk v0.2.0, all five rooms ≥0.999 coverage with the pull-time coverage gate passing natively. This is a tracking audit — POWRHOUSE has prior commitments from the 2026-06 long-term review (POWR 3 was 34.1% of facility yield), so the read below grades against those promises, not as a cold start. The short version: (1) POWR 4 is the bright spot — the CO₂ crash flagged last time (1431→603 ppm) is resolved, holding steady ~1487 ppm, and it is the only room actively stacking EC (+1.91 mS, 4.1→5.9 over the window) — textbook generative bulking. Its VPD is still soft (0.78 kPa) so that recommendation only partly landed. (2) POWR 3's drain-EC problem is unresolved — zone 57895 still reads 11.7→14.0 mS drain EC (peak 14.9), the 24 h leach we asked for has not been run. Substrate EC averages 7.01 mS at the top of the band; this is the highest-priority open item. (3) POWR 1 holds its bulking pattern but VPD stays soft (0.89 kPa vs 1.2–1.4) and the substrate-temp inversion persists (substrate 77.5°F ≥ air 77.5°F) — both prior YELLOW items are unchanged. (4) POWR 2 is mid-flush for turnover — substrate EC pulled back to 3.51 mS (net -0.32), tracking the ripening taper plan. (5) Veg Room runs an 18/6 day with a shallow 3.8 pp dryback and low 4.02 mS EC — appropriate for veg. Data window: 2026-05-27 → 2026-06-10; coverage 0.9991–0.9996 per room (Data Quality). Shot counts are derived from VWC step-up signatures (≥2 pp jumps in 1-h bins) — see the footnote. Dryback is in absolute pp (peak VWC − pre-irrigation low) throughout, per AROYA convention.
Each open item from the 2026-06 long-term review, graded against this window's data. GREEN = closed, AMBER = partial / unchanged, RED = unresolved. Two RED items closed (POWR 4 CO₂ resolved), one RED stays open (POWR 3 drain-EC leach), the YELLOW VPD/inversion items in POWR 1 are unchanged, and POWR 2's flush is on track.Cada compromiso previo evaluado contra los datos de esta ventana.
| RoomSala | ItemÍtem | CommitmentCompromiso | GradeCalificación | What the data showsQué muestran los datos |
|---|---|---|---|---|
| POWR 3 | POWR3-EC | Zone 57895 drain EC 11-12 mS sustained, no flush in 90d — schedule immediate 24h leach (0.5 mS feed). | RED · Still hot | POWR 3 zone 57895 drain EC still reads 11.7→14.0 mS over this window (peak 14.9) — the recommended 24 h leach has NOT been run. Substrate EC averages 7.0 mS (top of bulking band). The leach is still outstanding. |
| POWR 4 | POWR4-VPD | VPD 0.67 (target 1.0-1.4), RH 78.7% — drop RH 15pp or raise temp 3F; fix VPD before irrigation. | AMBER · Partly addressed | POWR 4 VPD now 0.78 kPa (was 0.67) and RH 76.6% (was 78.7) — RH came down but VPD is still below the 1.0–1.4 target. Direction is right; not yet in band. |
| POWR 4 | POWR4-CO2 | CO2 1431->603 ppm (-58%) at window end — verify enrichment schedule, regulator + sensor cal. | GREEN · Resolved | POWR 4 CO₂ now steady at ~1487 ppm across the window (was crashing 1431→603) — enrichment is back online and stable. Closed. |
| POWR 1 | POWR1-VPD | VPD 0.95 vs 1.2-1.4 bulking — drop RH 8pp or extend P3 dry-down 60min. | AMBER · Unchanged | POWR 1 VPD 0.89 kPa lights-on vs the 1.2–1.4 bulking target — still soft. RH 72.5% remains high. The P3 dry-down extension hasn't landed yet. |
| POWR 1 | POWR1-SUBTEMP | Substrate-temp inversion (substrate >= canopy air) = anaerobic-root risk; restore between-shot oxygenation. | AMBER · Inversion persists | POWR 1 substrate 77.5°F vs canopy air 77.5°F — substrate still ≥ air (inversion persists, anaerobic-root risk). |
| POWR 2 | POWR2-FLUSH | Active flush (drain 5.99->3.62, -39%) — hold 7-10d then taper for ripening. | GREEN · On track | POWR 2 substrate EC pulled back to 3.51 mS (window net -0.32) — the flush held and is tapering as expected for ripening/turnover. Tracking the plan. |
Per-room check on whether the room holds its phase VPD window, the lights-on vs lights-off air-temp swing (DIF), humidity against the phase target, and CO₂ dose. Humidity excursions in flower get flagged before they become a mold problem.Lectura por sala: VPD, DIF, HR vs objetivo y dosis CO₂.
| RoomSala | PhaseFase | VPD on (kPa) | VPD off | Temp on (°F) | Temp off (°F) | DIF (°F) | RH on (%) | CO₂ on (ppm) | Flag | VerdictVeredicto |
|---|---|---|---|---|---|---|---|---|---|---|
| POWR 1 | Bulking | 0.89 | 0.91 | 77.5 | 75.0 | 2.5 | 72.5 | 1469 | VPD low / RH high | VPD+RH off |
| POWR 2 | Ripening / Flush | 1.01 | 1.05 | 73.3 | 72.9 | 0.4 | 63.4 | 847 | VPD low / RH high | VPD+RH off |
| POWR 3 | Bulking | 1.00 | 1.20 | 74.1 | 70.9 | 3.2 | 65.0 | 1479 | VPD low / RH high | VPD+RH off |
| POWR 4 | Early Flower / Stretch | 0.78 | 0.70 | 78.4 | 75.7 | 2.7 | 76.6 | 1487 | VPD low / RH high | VPD+RH off |
| Veg Room | Vegetative | 0.77 | 0.85 | 80.2 | 80.1 | 0.1 | 78.2 | 1338 | VPD low / RH high | VPD+RH off |
Does the day's VPD profile match the day's shot rhythm and EC trajectory? A higher-VPD lights-on period pulls water out faster (higher ET) and needs P2 maintenance pulses to defend field capacity; a calmer day lets you cut P2 and drive a deeper P3 dry-down. Substrate EC is read as the output of steering — stacking in generative phases (good), pulling back in flush.¿El perfil VPD del día coincide con el ritmo de shots y la CE? La CE de sustrato es el resultado del manejo.
| RoomSala | PhaseFase | VPD on (kPa) | VWC envelope | Pore EC (Δ window) | Overnight dryback (absolute pp)Dryback nocturno (pp absoluto) | ET (pp/h) |
|---|---|---|---|---|---|---|
| POWR 1 | Bulking | 0.89 | 32–73% | 6.10 mS (+0.61) stacking | 41.8 pp above | 2.6 |
| POWR 2 | Ripening / Flush | 1.01 | 23–54% | 3.51 mS (-0.32) flushing | 31.0 pp in band | 1.6 |
| POWR 3 | Bulking | 1.00 | 30–69% | 7.01 mS (+0.51) stacking | 38.4 pp above | 2.3 |
| POWR 4 | Early Flower / Stretch | 0.78 | 44–67% | 4.85 mS (+1.91) stacking | 22.3 pp in band | 1.5 |
| Veg Room | Vegetative | 0.77 | 21–25% | 4.02 mS (+0.01) flat | 3.8 pp below | 0.2 |
One card per room. Steering intent (vegetatively vs generatively) is stated before the numbers. Dryback is in absolute percentage points (peak VWC − pre-irrigation low), per AROYA convention. Substrate EC is the result of your steering, not a feed setting. Harvest-group metadata (strain cycle, flip/harvest dates, plant count) is shown where a live HG exists.Una tarjeta por sala. Intención de manejo antes de los números. Dryback en pp absolutos (puntos porcentuales).
Click a room to focus its card + chart trace. Toggle Compare mode to overlay multiple rooms.Haga clic en una sala para enfocarla. Active modo Comparar.
For each room: VWC, pore EC, substrate temp, VPD, air-temp / RH, and CO₂ over the 14-day window, with phase target bands shaded. Read top-to-bottom: dryback in pp (VWC) → EC stack (pore EC) → root-zone temp → atmosphere (VPD, air, CO₂).Por sala: VWC, CE poro, temp sustrato, VPD, temp aire / HR y CO₂, con bandas objetivo de fase.
The 4-phase day is how the controller is programmed: P0 activation (lights-on → first shot — let the plant wake and start transpiring), P1 ramp-up (small shots back to field capacity + first runoff), P2 maintenance (pulses holding VWC at field capacity), P3 dry-down (last shot → next morning — the main steering lever). Shots/day, peak VWC, the field-capacity floor and overnight dryback (absolute pp) are derived from VWC step-up signatures (≥2 pp jumps in 1-h bins; no valve telemetry).El día de 4 fases: P0 activación, P1 rampa, P2 mantenimiento, P3 dry-down. Valores derivados de subidas VWC.
| RoomSala | PhaseFase | P1 onsetinicio | Shots/dayShots/día | Peak VWCVWC pico | FC floorPiso CC | Shot targetObjetivo shot | Overnight dryback (absolute pp)Dryback (pp absoluto) | SteeringManejo | Data agrees?¿Datos acuerdan? |
|---|---|---|---|---|---|---|---|---|---|
| POWR 1 | Bulking | lights-on + P0 delay | 11 | 73% | 43% | 3–5% | 41.8 pp | Generatively | over-dry vs band |
| POWR 2 | Ripening / Flush | lights-on + P0 delay | 4 | 54% | 40% | 6–10% | 31.0 pp | Generatively | agrees |
| POWR 3 | Bulking | lights-on + P0 delay | 10 | 69% | 40% | 3–5% | 38.4 pp | Generatively | over-dry vs band |
| POWR 4 | Early Flower / Stretch | lights-on + P0 delay | 6 | 67% | 52% | 6–10% | 22.3 pp | Generatively | agrees |
| Veg Room | Vegetative | lights-on + P0 delay | 0 | 25% | 25% | 3–5% | 3.8 pp | Vegetatively | under-dry |
Per-room phase with the AROYA target band for that phase: P1 shot size, dryback (absolute pp), pore EC band, VPD band, air-temp band and RH band. POWR 1 + POWR 4 phases are roster-verified; POWR 2/3 and the Veg Room are signal-inferred (between cycles).Fase por sala con la banda objetivo AROYA. POWR 1 y POWR 4 verificadas por roster.
Root-in (dryback 10–15 pp, shot 1–3%, EC feed ~3 mS, VPD ~0.8) → Veg (dryback 5–15 pp, shot 3–5%, substrate EC 3.0–5.0, VPD 0.8–1.1) → Early flower / stretch (dryback 20–30 pp absolute, shot 6–10%, P0 delay 120–240 min, substrate EC stacking 6.0–12.0, VPD 1.0–1.2) → Bulking (dryback 12–18 pp, shot 3–5%, runoff 20–30%, substrate EC 4.0–7.0, VPD 1.2–1.4) → Ripening (dryback 25–35 pp absolute · push 40 pp final week, shot 6–10%, substrate EC 6.0–8.0, VPD 1.4–1.6). Sources: AROYA Crop Steering: The Ultimate Guide; Grodan Cannabis Edition Ch. 3–4; Athena Vegetative Stage / Substrates Guide; Growlink Crop Steering E-Book.Root-in → Veg (5–15 pp) → Floración temprana (20–30 pp absoluto) → Bulking (12–18 pp) → Maduración (25–35 pp absoluto).
| RoomSala | PhaseFase | LightsLuces | P1 shot sizetamaño | Dryback target (absolute pp)Dryback objetivo | Pore EC bandBanda CE | VPD on/offVPD on/off | Temp onTemp on | RH on |
|---|---|---|---|---|---|---|---|---|
| POWR 1 room ID 13617 | Bulking (roster-verified) | ~12/12 | 3–5% (P1 ramp) | 12–18 pp absolute | 4.0–7.0 mS | 1.2–1.4 / 0.9–1.1 kPa | 74–80°F | 55–65% |
| POWR 2 room ID 13618 | Ripening / Flush (signal-inferred) | ~12/12 | 6–10% (P1 ramp) | 25–35 pp absolute | 6.0–8.0 mS | 1.4–1.6 / 1.0–1.2 kPa | 72–78°F | 45–55% |
| POWR 3 room ID 13619 | Bulking (signal-inferred) | ~12/12 | 3–5% (P1 ramp) | 12–18 pp absolute | 4.0–7.0 mS | 1.2–1.4 / 0.9–1.1 kPa | 74–80°F | 55–65% |
| POWR 4 room ID 13620 | Early Flower / Stretch (roster-verified) | ~12/12 | 6–10% (P1 ramp) | 20–30 pp absolute | 6.0–12.0 mS | 1.0–1.2 / 0.8–1.0 kPa | 77–84°F | 55–65% |
| Veg Room room ID 13621 | Vegetative (signal-inferred) | 18/6 | 3–5% (P1 ramp) | 5–15 pp absolute | 3.0–5.0 mS | 0.8–1.1 / 0.6–0.9 kPa | 76–82°F | 60–75% |
Prioritized, plain-language. Owner = facility lead; Grower = day-to-day room operator; Process = AROYA / Addium follow-up. Each ties to the data, the phase target and the prior commitment it closes.Priorizadas. Owner = responsable; Grower = operador; Process = AROYA / Addium.
This report was generated end-to-end via aroya-sdk v0.2.0. All five rooms were pulled as 7 stitched 2-day chunks each (35 sequential /rooms/<id>/chart/ GETs), deduped on timestamp, with the pull-time coverage gate (threshold 0.90) passing natively — zero 429s, zero failed chunks. Coverage below is the SDK's per-room ratio.Reporte generado de extremo a extremo con aroya-sdk v0.2.0. Cobertura por sala del SDK.
| RoomSala | SDK coverage ratioCobertura SDK | SeriesSeries | WindowVentana | ChunksTramos | NotesNotas |
|---|---|---|---|---|---|
| POWR 1 | 0.9991 | 48 | 14d (336 hr-bins) | 7/7 ok | Full substrate + climate suite. Coverage gate passed natively at pull time (threshold 0.90). |
| POWR 2 | 0.9994 | 97 | 14d (336 hr-bins) | 7/7 ok | Full substrate + climate suite. Coverage gate passed natively at pull time (threshold 0.90). |
| POWR 3 | 0.9996 | 72 | 14d (336 hr-bins) | 7/7 ok | Full substrate + climate suite. Coverage gate passed natively at pull time (threshold 0.90). |
| POWR 4 | 0.9991 | 39 | 14d (336 hr-bins) | 7/7 ok | Full substrate + climate suite. Coverage gate passed natively at pull time (threshold 0.90). |
| Veg Room | 0.9991 | 28 | 14d (336 hr-bins) | 7/7 ok | Full substrate + climate suite. Coverage gate passed natively at pull time (threshold 0.90). |